Record of VLHC meetings and talks
1999 AT FERMILAB
AWAY FROM THE LAB
December 22. Energy "Tripler" Meeting
Vladimir Kashikhin, "Corrector Magnets and Lambertsons"
Gerry Jackson, "Straight Section 'C' Details"
Joe Lach, "TBM Monitoring Project status report"
December 15. Energy "Tripler" Meeting
Terry Anderson, "Vacuum system Design and Cost"
Gerry Jackson, "Revisiting Vacuum Requirements"
December 10. VLHC low-field Technical Meeting
December 8. Energy "Tripler" Meeting
George Krafczyk, "Energy Tripler Kicker Design and Costs"
Bruce Hanna, "Introduction to Vernier Kickers"
November 19. VLHC low-field Technical meeting.
November 12. VLHC low-field Technical meeting.
November 10. Energy "Tripler" Meeting
Ron Walker, "Heat Leak Measurements on Super-Insulators"
Gerry Jackson, "Outline for the Design Report and Writing Assignments
OCTOBER 27. Energy "Tripler" Meeting
Steve Hays, "Main Power Supply for the Energy Tripler"
Bill Foster, "What are at the ends of the magnets?"
Tim Burke, "Drop shafts, footprint" followed by a discussion of the Abort system
October 22. VLHC low-field Technical meeting.
October 22. Tevatron Tripler Meeting.
OCTOBER 20. Energy "Tripler" Meeting
Jim Volk, "Permanent Transfer Line Magnets"
Ryuji Yamada, "Exploring the possibility of a second, high field machine in the same tunnel as the energy tripler"
October 15. Tevatron Tripler. Peter Bagley: "Collider experience from Run I and plans for Run II."
October 15. VLHC low-field Technical meeting.
OCTOBER 13. Energy "Tripler" Meeting
T. Murphy - "Site-Riser Network Considerations"
Dave Johnson - "Lattice Definition Progress Report"
OCTOBER 6. Energy "Tripler" Meeting
G. Jackson - "Initial Kicker Specifications"
G. Jackson - "First look at Electron Multipactoring"
T. Burke - "Review of Initial Tunnel and Transfer Line Geometry"
SEPTEMBER 22. Energy "Tripler" Meeting
H.Piekarz - "Results from 100kA Conductor Test"
D.Wildman - "RF Cavity Design"
SEPTEMBER 15. Energy "Tripler" Meeting
C.Laughton - "Tunneling and Civil Construction Issues"
E.Malamud - "Final Footprint for Oth-Order Design Report"
September 17. VLHC low-field Technical meeting.
September 10. VLHC low-field Technical meeting. More analysis of data from Aug. 30 and new design of conductor.
SEPTEMBER 8. Energy "Tripler" Meeting.
G. Jackson, "Straight Section Insertion Designs"
G. W. Foster, "Dipole Correctors: Strength and Design"
September 3. VLHC low-field Technical meeting.
SEPTEMBER 1. Energy "Tripler" Meeting.
G.W.Foster - "Crossover Lattice Concept For Crossing
Between Inner and Outer Arcs"
and "Design of Straight Section Quadrupoles"
T.Anderson - "Vacuum System Design and R&D Program"AUGUST 18. Energy "Tripler" Meeting.
AUGUST 25. Energy "Tripler" Meeting.
August 24. Peter McIntyre, remarks on stress management, and R. Yamada, 25 TeV collider.
August 24. Beams Division Seminar. Peter McIntyre "The Tevatron Energy Tripler"
AUGUST 18. Energy "Tripler" Meeting.
AUGUST 11. Energy "Tripler" Meeting.
August 6. VLHC low-field Technical meeting.
AUGUST 4. Energy "Tripler" Meeting.
July 27. Informal meeting on "High field magnets in Tevatron Tunnel" Speaker: M. Wake.
July 9. VLHC low-field Technical meeting in MW-9.
July 2. VLHC low-field Technical meeting in MW-9.
June 23. VLHC construction/installation meeting
June 23. VLHC low-field meeting.
June 18. VLHC low-field Technical meeting in IB2
June 11. VLHC low-field Technical meeting in IB2
June 4. VLHC low-field Technical meeting in MW9.
June 2. VLHC low-field meeting. Nb3-Al transmission line conductors, report by Henryk on test loop assembly & instrumentation, plan for evolution of the MW9 test stand to drive longer magnets (Foster), mechanical gap spacer tests and magnetic calculations on return conductor forces (Kashikin)
May 28, VLHC low-field Technical Meeting: final system assembly plans, final responses to the Safety Panel, cabling and DAQ hardware status, system commissioning plan.
May 21, VLHC low-field Technical Meeting: cryosystem assembly, responses to Safety Panel, gas/cryo controls and system commissiong, iron shields, cabling and DAQ hardware status
May 14, VLHC low-field Technical Meeting: status, responses to Safety Panel, gas/cryo controls, DAQ hardware/software status, commissioning, temperature bump
May 7, VLHC low-field Technical Meeting: status, responses to Safety Panel, gas/cryo controls, DAQ hardware/software status, commissioning, temperature bump, poster session
May 4, Construction/Installation team meeting.
April 30, VLHC low-field Technical Meeting: loop status, safety review, gas/cryo controls, DAQ hardware/software status, posters for DOE review
April 23. VLHC low-field Technical Meeting: loop status, safety review, Sumitomo status and temperature bump.
April 16. VLHC low-field Technical Meeting
April 14. Low Field Magnet Meeting. Mike McAshan, "Possible thermal shield designs and tradeoff for both the transmission line and the cryo distribution line."
April 8. VLHC low-field Technical Meeting
March 25. VLHC low-field Technical Meeting
March 3. Low Field Magnet Meeting at MW-9.
March 1. Construction/Installation Team Meeting
Feb. 24 - 26. vlhc Wire Workshop, Lake Geneva, WI
Feb. 22 - 25 vlhc Accelerator Physics Workshop at Fontana, Wisconsin
Feb. 17. Low-field magnet meeting.
Feb. 8 - 11. vlhc Accelerator Technologies Workshop at Thomas Jefferson Laboratory
Feb. 3. Low-field magnet meeting.